Coverage (Covered area) will be used for certain farm work ability of certain period, which is a seasonal period of for a crop.
Coverage is simply obtained by following process.
CA = DC * AWD / N Eq.
3-1CAS = DC * AWD / M / N Eq. 3
-2CAS = EFC * ANWH / N Eq. 3
-3CAW = CA
where,
symbol |
term |
unit |
CA |
Coverage (Covered area) |
ha |
CAS |
Coverage of one set |
ha |
DC |
Daily capacity |
ha/d |
AWD |
Available work days |
d |
EFC |
Effective field capacity |
ha/h |
ANWH |
Available net working hour |
h |
M * |
Number of machine set |
- |
N * |
Number of operation times |
- |
* : normally M and N = 1
Example: Next table and See fm-311.xls and fm-33.xls.
Table 311. Example of Covered Area
Item |
Effective Field Capacity |
Daily Capacity |
Available work days |
No. operation |
Covered area |
|||||||
Work Name |
Implement |
Work hour |
Net Work rate |
Net Work |
Daily Capacity |
Operation Period |
Days of work period |
Rate of available work day |
Available work days |
|||
symbol |
EFC |
Dt |
NWR |
Dn |
DC |
WP |
DWP |
ADR |
AWD |
N |
CAS |
|
unit |
ha/h |
h/d |
% |
h/d |
ha/d |
date |
d |
% |
d |
- |
ha |
|
Tillage |
Rotary 1.8m |
0.266 |
10.0 |
72 |
7.2 |
1.92 |
Apr.1-May 20 |
50 |
74 |
37.0 |
1 |
71.0 |
Harrowing |
Paddy harrow |
1.132 |
10.5 |
70 |
7.4 |
8.32 |
May.1-May 20 |
20 |
73 |
14.6 |
2 |
60.7 |
Trans-planting |
Rice transplanter 2-row |
0.036 |
10.5 |
67 |
7.0 |
0.26 |
May.1-May 20 |
20 |
73 |
14.6 |
1 |
3.7 |
Herbicide |
Knapsack power sprayer |
1.800 |
11.0 |
80 |
8.8 |
15.84 |
July 1-July 5 |
5 |
60 |
3.0 |
1 |
47.5 |
Harvest |
Head-feeding combine |
0.052 |
8.5 |
65 |
5.5 |
0.29 |
Sep.25-Nov.10 |
47 |
65 |
30.6 |
1 |
8.8 |
Exercise. 3-1, 3-2
Available work days means actual days available to work.
Freezing temperatures, precipitation, excessive deficient soil moistures, and other weather related factors may limit field machines operations. As weather variability is great, any prediction of the number of future working days can only be made probabilistically.
The number of working days in any time period is a function of: climatic region, slope of soil surface, soil type, drainage characteristics, operation to be performed, and traction devices.
AWD = DWP * ADR Eq. 3
-4Where,
symbol |
term |
unit |
AWD |
Available work days |
d |
DWP |
Days of work period |
d |
ADR |
Rate of available work days |
% |
Table 32. Example of Available work days
Work Name |
Implement |
Effective Field Capacity |
Net Work hours |
Daily Capacity |
Working period |
Days of work period |
Rate of avail- able work day |
Avail-able work days |
EFC |
Dn |
DC |
WP |
DWP |
ADR |
AWD |
||
ha/h |
h/d |
ha/d |
date to date |
d |
% |
d |
||
Tillage |
Bottom plow 14"x2 |
0.224 |
7.2 |
1.61 |
Apr.1- May 20 |
50 |
74 |
37.0 |
Tillage |
Rotary 1.8m |
0.266 |
7.2 |
1.92 |
Apr.1- May 20 |
50 |
74 |
37.0 |
Harrowing |
Paddy harrow 20 |
1.132 |
7.4 |
8.32 |
May.1- May 20 |
20 |
73 |
14.6 |
Trans-planting |
Rice trans-planter 2-row |
0.036 |
7.0 |
0.26 |
May.1- May 20 |
20 |
73 |
14.6 |
Exercise. 3-3
Available net working hour
ANWH = AWD * Dn Eq. 3
-5Where,
symbol |
term |
unit |
ANWH |
Available net working hour |
h |
AWD |
Available work days |
d |
Dn |
Net working hours |
h/d |
3-3. Rate of Available Work Days
In the work period, machines are not available for use due to the precipitation and periodical machine maintenance etc. Therefore, these unavailable days are deducted from total work days of the period.
The weather condition and its suitability to out side work can be get in the weather chart for agriculture which was gathered by meteorological agency.
Table 33a shows the rate of monthly available work day based on the data of “available work days at outside”.
Table 33a. The Rate of Monthly Available Days for Machinery Work with Judging from Weather (%)
Month Area Place |
Jan. |
Feb. |
Mar. |
April |
May |
June |
July |
Aug. |
Sept. |
Oct. |
Nov. |
Dec. |
|
Hokkaido |
Sapporo |
0 |
0 |
0 |
73 |
73 |
70 |
71 |
69 |
75 |
61 |
57 |
0 |
Kanto |
Kumagaya |
90 |
88 |
84 |
75 |
73 |
62 |
71 |
82 |
67 |
74 |
87 |
94 |
Okinawa |
Naha |
77 |
75 |
77 |
68 |
60 |
52 |
74 |
65 |
73 |
74 |
82 |
77 |
See fm-33a.xls (for upland work see ASAE-D497)
Exercise. 3-4
See 5-1-6. Coverage of plural farm works
How to obtain the optimal machinery capacity, when farm scale or coverage of farm system is given?
DC = CA * N / AWD Eq.
3-6EFC = DC / Dn Eq. 3
-7TFC = EFC / EF * 100 Eq. 3
-8Where,
symbol |
term |
unit |
tillage 1 |
tillage 2 |
TFC |
Theoretical Field Capacity |
ha/h |
0.315 |
0.360 |
EF |
Field Efficiency |
% |
71.0 |
74.0 |
EFC |
Effective Field Capacity |
ha/h |
0.224 |
0.266 |
Dn |
Net working hours |
h/d |
7.2 |
7.2 |
DC |
Daily Capacity |
ha/d |
1.61 |
1.92 |
AWD |
Available work days |
d |
37 |
37 |
N |
No. of operation |
- |
1 |
1 |
CA |
Coverage |
ha |
59.6 |
71.0 |
Example: Obtaining EFC, TFC from Coverage in above case.
Exercise. 3-5, 3-6
Selection of machineFrom equation 2-9,
W = (TFC / V) * 10 Eq.
3-9Table 352 Example: Obtaining machine width from TFC
symbol |
term |
unit |
Example |
|
Work name |
Tillage 1 |
Tillage 2 |
||
Implement |
Bottom plow |
Rotary |
||
TFC |
Theoretical Field Capacity |
ha/h |
0.315 |
0.360 |
V |
Speed |
km/h |
4.5 |
2.0 |
W |
Width |
m |
0.7 |
1.8 |
See fm-351.xls
Exercise. 3-7
Exercise 3-1.
When Daily capacity =0.48 ha/d, Available work days =21 d, obtain Coverage of one set.
Exercise 3-2.
When Effective field capacity =0.009 ha/h, Number of workers = 5, Available work days =21.9 d, Net work hour=6.4h/d , obtain Coverage of this manual weeding.
Exercise 3-3.
When Days of farm work period =(April 10 to 24), Rate of available work days = 75%, obtain Available work days.
Exercise 3-4.
Pick up a farm work in your country (Example: tillage). Select a machine and list up width and speed.
1. Obtain Theoretical Field capacity (TFC) and Effective Field capacity (EFC).
2. Obtain Daily capacity (DC) by using working hour per day (Dt) and Daily net working rate (NWR).
3. Obtain coverage (CA) of the farm work using operation period (DWP) and rate of available work days (AWDR).
4. Submit paper and FD.
Exercise 3-5.
When Coverage (CA)=3.7ha, Number of operation times (N) =1, Available work days (AWD) =14.6d, Net working hours (Dn) =7.0 h/d, Field Efficiency (EF) =55.0%, obtain Daily Capacity (DC), Effective Field Capacity (EFC) and Theoretical Field Capacity (TFC) of this farm work.
Exercise 3-6.
When Coverage (CA)=60.7ha, Number of operation times (N) =2, Available work days (AWD) =14.6d, Net working hours (Dn) =7.4 h/d, Field Efficiency (EF) =82.0%, obtain Daily Capacity (DC), Effective Field Capacity (EFC) and Theoretical Field Capacity (TFC) of this farm work.
Exercise 3-7.
When Theoretical Field Capacity (TFC) =0.135 ha/h, Speed(V) =1.8km/h , obtain Width(W) of machine for this farm work.